Iran Cuts 2,500 MW from Power Grid Through Demand Management
Tavanir cut over 2,500 MW from Iran's power grid through a virtual power plant demand program, avoiding new infrastructure, fuel, or land — equivalent to 200 MW of installed solar capacity per 40 MW saved.

Tags: tavanir · iran-energy · power-grid · demand-management · virtual-power-plant ·
Original source: IRNA